SONASID EL JADIDA 20K V

20 KV cells testing

Successful project completion with SONASID

The recent project with GROUPE SONASID, was successful, ensuring optimal performance, reliability, and safety of their 20 KV cells. Our skilled SSE MULTINATIONAL team conducted comprehensive testing and maintenance activities to uphold the highest industry standars.

"At SSE MULTINATIONAL, we believe that true success in any project comes from a commitment to quality, precision, and dedication to the client’s vision. Every project we complete reflects our team's expertise and our determination to set high standards in safety, reliability, and innovation. Our partnership with clients like SONASID is a testament to our ability to deliver results that not only meet but exceed expectations, establishing trust and value in everything we do."

- YOUNESS ELALOINI

Features of Project

  • High Voltage Safety Compliance: Ensuring full adherence to safety standards for 20kV electrical systems, maintaining a secure and reliable operational environment.

  • Advanced Testing and Diagnostics:

    • High Voltage Testing for identifying potential electrical issues early.
    • Relay Testing to verify that protective relays function accurately under fault conditions.
    • Circuit Breaker Analyzer Testing to assess breaker performance and prevent unexpected power disruptions.
    • Current Transformer (CT) Testing for maintaining accurate measurements and protection.
  • Enhanced Insulation and Protection:

    • Insulation Testing on medium-voltage cells to ensure reliability and prevent electrical faults.
    • Application of Anti-Arc Paint to minimize risks from arc faults and enhance safety in high-voltage areas.
    • Insulating Paint on MV Insulators to prevent electrical discharge and extend equipment lifespan.
  • Maintenance Upgrades and Equipment Replacement:

    • Replacement of Terminal Boxes to improve connectivity and ensure high-quality electrical performance.
    • Contact Resistance Testing for cells, reducing energy loss and increasing efficiency.
  • Dust and Arc-Protection Coatings:

    • Anti-Dust Floor Coating (optional) in the substation, enhancing cleanliness and reducing contamination.
    • Anti-Arc and Insulation Coatings to further protect equipment and personnel from high-voltage risks.
  • Commitment to Industry Standards: Execution of all tasks in line with stringent industry requirements to guarantee long-term safety and operational efficiency.

  • Optimized Operational Reliability: Comprehensive testing and maintenance steps ensure that the 20kV cells are fully functional and prepared to handle operational demands.

Project Information

delivering quality solutions for SONASID’s 20kV infrastructure

Client Name

SONASID

Category

Upgrade

Start Time

15 Oct, 2024

End Time

30 Oct, 2024

Budget

$xxxxxxxxx

Location

SONASID EL JADIDA, MA